PLATFORMS INSTALLATION :-

      Client : Gulf of Suez Petroleum Co. ( GUPCO )                  Location : Ras Shukeir.
       Installation of eight production platforms (welding - driving piles, rigging and pipe                         connection)
       Installation of two platforms
       Installation of jetty for water intake

      Client : Ports and lighthouses Authority                               Location : Alexandria
       Construction and installation of 6 Leg beacons by driving piles - Alexandria Marine                   Entrance
.
      Client : (Suco) ( EE-85 Field )                                           Location : Ras Budran
       Fabrication, erection and painting of deck structure of two offshore drilling platforms for             EE-85 Field development.

      Client : Egyptian petroleum Co.                                         Location : Alexandria
       Jacket installation and pilling for the Ethylene platform at Dekheila - Alexandria.
       Five Bridges installation.
       Two Mooring Platforms installation.
       Four Breasting dolphins installation.
       Vent pile installation.                                                                                                                        
      Client :Petrobel                                                                Location : Ras Gara
       Fabrication and erection deck structure for production platform

Home     Activites       Marine Spread      Company profile     Certificates     Leading Posts       Diving      Contact US
Copyright © 2004-2006 Hassan Abou ELSeoud. All rights reserved.